Ideas & advice
Clear answers before you make expensive decisions.
Big home decisions often start with a small question. Our advice explains the issue clearly, shows what depends on your property and points you towards the next useful step without pretending a general article can replace project-specific advice.
Wraparound extensions: what should you consider before you start?
A wraparound extension combines side and rear extension space to create a larger ground-floor change. It can unlock a substantial new layout, but it…

Side return extensions: what makes them work?
A side return extension uses the narrow strip of space beside the rear part of many terraced and semi-detached homes. The attraction is obvious:…

Lawful development certificate: what is it and when is it useful?
A lawful development certificate is a formal decision from the local planning authority confirming that an existing or proposed use or development is lawful…

Do you need planning permission in a conservation area?
Living in a conservation area does not mean every change needs planning permission, but some permitted-development rights are more restricted and local Article 4…

Listed building consent: when do you need it?
Listed building consent is required in England where proposed demolition, alteration or extension would affect the character of a listed building as a building…

Do I need a Party Wall Agreement for my extension?
Not every extension needs Party Wall procedures, but some building work in England and Wales falls within the Party Wall etc. Act 1996 and…

How much does planning permission cost?
Planning permission cost has more than one part. There is the local planning authority’s application fee, and there may also be professional fees for…

What do Building Regulations drawings cost?
Building Regulations drawing fees vary because the amount of technical work varies. A small, straightforward extension is a different technical package from a project…

How much does a structural engineer cost?
Structural engineer fees vary because the engineering problem varies. A single beam calculation for a straightforward wall opening is a different appointment from designing…

How long does a loft conversion take?
A loft conversion does not have one universal programme. The timescale depends on the roof, conversion type, structural work, planning route, Building Regulations, contractor…

What really affects the cost of a home renovation?
Home renovation cost is difficult to reduce to a single figure because “renovation” can mean anything from updating finishes to restructuring an entire house.…

Do I need planning permission for a loft conversion?
Not always. In England, many loft conversions to houses can fall within permitted development rights, provided the proposal meets the relevant limits and conditions.…

Let’s start with a conversation
When the general answer is no longer enough, bring us the actual home.
Tell us what you are considering and where you are stuck. We can help turn the general guidance into a project-specific next step.
Start With Your Home











